top of page

TRENCH & FOUNDATIONS

STAGE ONE

1ST ROUGH DRAFT

  • Dig Trench (Total size of plot)

  • Attach Plywood sides

  • Fix Polystyrene sheets to the wood

  • Reinforce mesh cage

  • Fill with concrette

  • Extract remaining soil

  • Frame and strengthen the sides

  • Reinforce steel mesh on the floor

  • Pour concrete base.

All Videos

Eco House Project Foundations

Rolling Spider Television
Search video...
All Categories
All Categories
Foundations

Eco House Project Foundations

00:00
Play Video
bottom of page